NKT Road & Toll Private Limited
Sector: Road • Location: India
Source: World Bank Group
NKT Road & Toll Private Limited was created to improve and operate the section of Ahmednagar - karmala - Tembhurni of State Highwat 141 from Km 80/600 To 140/080 under BOT basis. The total length was 60 km. The project was awarded by Public Works Department on behalf of Government of Maharashtra to IRB Infrastructure under a 15 year concession contract including 30 months of construction period. T
- Status
- Prospective
- Sector
- Road, Waste Processing and Treatment, Bridge, Government
- Location
- India
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about NKT Road & Toll Private Limited
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | NKT Road & Toll Private Limited was created to improve and operate the section of Ahmednagar - karmala - Tembhurni of State Highwat 141 from Km 80/600 To 140/080 under BOT basis. The total length was 60 km. The project was awarded by Public Works Department on behalf of Government of Maharashtra to IRB Infrastructure under a 15 year concession contract including 30 months of construction period. The concession contract was signed in November 2001 and the starting period (construction) was December 2001. The construction phase was completed in August 2003. The concession period was to end in December 2016. The public works included: a) Widening of existing formation of carriagway from 7 mtr to 12 mtr = 56.330 kms b) Widening / Reconstruction of Minor Bridges = 12 Nos. c) Widening / Reconstruction of CD Works / Slab Drains = 71 Nos. d) Junction Improvements = 18 Nos. e) Construction of Bus-bays = 14 Nos. f) Adequate Road Furniture g) Toll Plaza Complex = 1 No. h) Operation and Maintenance till end of concession Period The project cost was estimated to be INR 368 Millions (US$7.8 million). The project reached financial closure in December 2001 with a loan from State Bank of India. |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | India |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Waste Processing and Treatment, Bridge, Government |
Article published date | 2024-09-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in India
- Dholera Solar Park Gujarat
- Sugen 1100MW CCGT Akhakhol Gujarat
- ONGC Tripura Power Plant
- Cable-stayed bridge project in the Chambal River
- Mumbra Bypass Project
- Essel Gwalior Shivpuri Toll Roads Private Limited
- RattanIndia Power Limited (Amravati Thermal Power Project)
- GVRMP Belgaum Khanapur Tollway Private Limited