logo
ProjectStudy And Design

NM 30 Improvements Project, Phase 2

Study and design · New Mexico

Source: New Mexico Department of Transportation (NMDOT)

The NMDOT, in cooperation with FHWA, is proposing to improve traffic and safety conditions on NM 30 from milepost 0.0 at the NM 502 interchange to milepost 8.5 approaching the US Highway 84/285 intersection in Española. Due to fiscal constraints, three phases for design and construction were developed. The purpose of the proposed project is to provide physical, operational, and safety improvements

Status
Prospective
Sector
Car parking, Road, Government, Waste Processing and Treatment, Automotive
Location
New Mexico, United States of America
Updated
19 Nov 2026
Source
New Mexico Department of Transportation (NMDOT)

ConstructChat

Ask ConstructChat about NM 30 Improvements Project, Phase 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “NM 30 Improvements Project, Phase 2” is an infrastructure initiative in the Car parking sector, located in New Mexico, United States of America. Taiyo aggregates data on it from New Mexico Department of Transportation (NMDOT).

Participants

Not available for this record.

Status

Original status

study and design

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The NMDOT, in cooperation with FHWA, is proposing to improve traffic and safety conditions on NM 30 from milepost 0.0 at the NM 502 interchange to milepost 8.5 approaching the US Highway 84/285 intersection in Española. Due to fiscal constraints, three phases for design and construction were developed. The purpose of the proposed project is to provide physical, operational, and safety improvements to help ensure that travel on this segment of NM 30 is safe and efficient and meets the needs of the current and future users. NM 30 has poor pavement conditions including cracking and rutting, increasing traffic volumes create traffic congestion and unsafe driving conditions, and this facility lacks multimodal facilities. Phase II extends from milepost 4.9 to 8.4 excluding the Phase I segment. Phase II has been authorized for final design, right-of-way acquisition, and construction. As part of Phase II from milepost 4.9 to 6.6, the roadway would consist of four 12-foot driving lanes, a 16-foot median, 8-foot outside shoulders, curb and gutter at the edge of the outside shoulders, and a 5-foot sidewalk on both sides of the roadway. A protected left turn lane would be provided for existing intersections and turnouts. The remaining portion of the project from milepost 6.6 to 8.362 would consist of two 12-foot driving lanes, 8-foot shoulders, a 16-foot median with protected left turn lanes at the major intersections, curb and gutter, and sidewalk. Right turn lanes would be installed at Wagon Road and the Tribal Court House. Drainage improvements consist of extending existing crossing structures to match the new slope limits of the wider roadway section.

Location

Country

United States of America (USA)

State

New Mexico

Source

Source

New Mexico Department of Transportation (NMDOT)

URL

More Details

Record type

Project

Sector

Car parking, Road, Government, Waste Processing and Treatment, Automotive

Article published date

2024-08-12

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project