NM 612 Drainage Structure Replacement
Study and design · New Mexico
Source: New Mexico Department of Transportation (NMDOT)
This project is located on NM 612 between milepost 8 and 11. The design involves replacement of two aging and hydraulically undersized culverts with new culverts designed to handle current and predicted drainage conditions and ensure continued highway service to residents and traffic to Bluewater Lake State Park and the Cibola National Forest.
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Road
- Location
- New Mexico, United States of America
- Updated
- 19 Nov 2026
- Source
- New Mexico Department of Transportation (NMDOT)
ConstructChat
Ask ConstructChat about NM 612 Drainage Structure Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | study and design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | This project is located on NM 612 between milepost 8 and 11. The design involves replacement of two aging and hydraulically undersized culverts with new culverts designed to handle current and predicted drainage conditions and ensure continued highway service to residents and traffic to Bluewater Lake State Park and the Cibola National Forest. |
Location
Country | United States of America (USA) |
State | New Mexico |
Source
Source | New Mexico Department of Transportation (NMDOT) |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Road |
Article published date | 2025-01-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
