logo
ProjectStudy And Design

NM 68 Roadway Improvements Project - Phase 2 Milepost 1.4 to 2.4

The status, timeline and source of this project. A free account opens every field.

Source: New Mexico Department of Transportation (NMDOT)

Design for the NM 68 corridor in Española between US 84/285 and just north of the Po'Pay Ave intersection, divided into three phases for design development and construction.

Status
Prospective
Location
New Mexico, United States of America
Updated
19 Nov 2026
Source
New Mexico Department of Transportation (NMDOT)

ConstructChat

Ask ConstructChat about NM 68 Roadway Improvements Project - Phase 2 Milepost 1.4 to 2.4

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “NM 68 Roadway Improvements Project - Phase 2 Milepost 1.4 to 2.4” is an infrastructure initiative, located in New Mexico, United States of America. Taiyo aggregates data on it from New Mexico Department of Transportation (NMDOT).

Participants

Not available for this record.

Status

Original status

study and design

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Design for the NM 68 corridor in Española between US 84/285 and just north of the Po'Pay Ave intersection, divided into three phases for design development and construction.

Location

Country

United States of America (USA)

State

New Mexico

Source

Source

New Mexico Department of Transportation (NMDOT)

URL

More Details

Record type

Project

Article published date

2024-11-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project