logo

NMDC Integrated Iron and Steel Plant at Nagarnar [Bastar] [3 MTPA]

Sector: Energy Storage • Location: Chhattisgarh, India

Source: India Investment Grid (IIG)

Project
Closed

Economic/Social Impact of the Project NMDC is constructing a 3.0 million Tonne Per Annum [MTPA] Integrated Steel Plant at Nagarnar, 16 Kilometres [Kms] away from Jagdalpur, Bastar District, Chhattisgarh. The upcoming 3MTPA Steel Plant of NMDC will enhance the steel production capacity of the country. Further this Steel plant will generate employment opportunity, boost the local economy, generate

Project Information FAQ

Project Information

5 Q
The project “NMDC Integrated Iron and Steel Plant at Nagarnar [Bastar] [3 MTPA]” is an infrastructure initiative in the Energy Storage sector, located in Chhattisgarh, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Economic/Social Impact of the Project NMDC is constructing a 3.0 million Tonne Per Annum [MTPA] Integrated Steel Plant at Nagarnar, 16 Kilometres [Kms] away from Jagdalpur, Bastar District, Chhattisgarh. The upcoming 3MTPA Steel Plant of NMDC will enhance the steel production capacity of the country. Further this Steel plant will generate employment opportunity, boost the local economy, generate alternative livelihood for local people, developing ancillary units in and around Bastar region. The plant consists of 2 nos. 7m tall Coke oven Batteries, 460m2 Sinter Plant , 4500 m3 Blast Furnace, 2x175 T BOF, Thin slab Caster and Hot strip Mill and other associated facilities. This Plant is designed to produce 3million Ton of HR Coils per year MECON Limited is the Engineering, Procurement, Construction Management [EPCM] consultant. Project is in advance stage of completion and commissioning activities have been started. First phase of Commissioning i.e 1st Coke pushing was done on 28.10.2022 from Coke Oven Battery-1 . Coke Oven Battery-1 is in operation along with By-Product Plant. Different units of By- Product Plant are being stabilised. Other major units like Blast Furnace, SMS and TSC HSM Package are under testing and trials. Utilities like water systems, Compressor air systems and Electrical power systems are under operation.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data