NM/DOT: Electric Vehicle and Charging Improvements
Sector: Electric Vehicles (EVs) • Location: Mesquite, New Mexico, United States of America
Source: Dodge
Point location at Stern Dr Point location at Goldhill Rd and 7 Slash F Rd Description To strategically deploy publicly accessible electric vehicle charging infrastructure and other alternative fueling infrastructure. The corridor charging track focuses on the deployment of electric vehicle charging along designated alternative fuel corridors.
- Status
- Prospective
- Sector
- Electric Vehicles (EVs), Power Generation (CCGT), Automotive, Manufacturing (Industrial), Commercial
- Location
- Mesquite, New Mexico, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about NM/DOT: Electric Vehicle and Charging Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Point location at Stern Dr Point location at Goldhill Rd and 7 Slash F Rd Description To strategically deploy publicly accessible electric vehicle charging infrastructure and other alternative fueling infrastructure. The corridor charging track focuses on the deployment of electric vehicle charging along designated alternative fuel corridors. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Mexico |
City | Mesquite |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Electric Vehicles (EVs), Power Generation (CCGT), Automotive, Manufacturing (Industrial), Commercial |
Article published date | 2025-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Electric Vehicles (EVs) projects in United States of America
- PV SOLAR ROOF MOUNT SYSTEM: (15) 400W MODULES AT 6 KW TOTAL. INSTALL EV CHARGER.
- MGM Tobacco Certificate of Nonconforming Use
- Tasman East - 5123 Calle Del Sol (Ensemble)
- The College of Southern Nevada's CONNECTIVITY CONCIERGES
- Construction of a manufacturing facility for electric vehicle batteries for Panasonic Energy in De Soto, Kansas (United States)
- MAYFIELD TO JEWEL ROAD
- FY2008 Discretionary Grants for the Family Violence Prevention and Services Program
- 122402 MILLS AVE NE Citywide Alley Restoration
