logo
ProjectPlanning Schematics

NM/DOT: EV Charging Infrastructure Improvements

Planning schematics · New Mexico · Last reported Mar 2024

Source: Dodge USA

Point location at 2 Vista Del Monte Santa Fe Point location at 2721 Coors Blvd. NW Albuquerque Point location at 103 W. Santa Fe Ave. Grants Point location at 215 3rd. St. Maxwell Point location at 712 S Camino Del Pueblo Bernalillo Description EV charging infrastructure Production Date

Status
Prospective
Sector
Automotive, Electric Vehicles (EVs), Road, Commercial, Power Generation (CCGT), Manufacturing (Industrial)
Location
Albuquerque, New Mexico, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about NM/DOT: EV Charging Infrastructure Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “NM/DOT: EV Charging Infrastructure Improvements” is an infrastructure initiative in the Automotive sector, located in Albuquerque, New Mexico, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Point location at 2 Vista Del Monte Santa Fe Point location at 2721 Coors Blvd. NW Albuquerque Point location at 103 W. Santa Fe Ave. Grants Point location at 215 3rd. St. Maxwell Point location at 712 S Camino Del Pueblo Bernalillo Description EV charging infrastructure Production Date

Procurement method

Budget

Location

Country

United States of America (USA)

State

New Mexico

City

Albuquerque

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Automotive, Electric Vehicles (EVs), Road, Commercial, Power Generation (CCGT), Manufacturing (Industrial)

Article published date

2024-04-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project