logo

Noeline’s Extension and Renovation / The Silent Architect

Sector: Steel • Location: Sri Lanka

Source: ArchDaily

Project
Closed

It was identified that the project location carries a huge potential architecturally, as well as commercially, due to the carefully developed facades of the Stra3ord Avenue culminang in an interesting modern classical street elevaon among the bustling cites, new development schemes. The said plot was the blending point of this beautiful commercial street elevation to the general residential buildi

Project Information FAQ

Project Information

3 Q
The project “Noeline’s Extension and Renovation / The Silent Architect” is an infrastructure initiative in the Steel sector, located in Sri Lanka. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

It was identified that the project location carries a huge potential architecturally, as well as commercially, due to the carefully developed facades of the Stra3ord Avenue culminang in an interesting modern classical street elevaon among the bustling cites, new development schemes. The said plot was the blending point of this beautiful commercial street elevation to the general residential building line and a literal bending point of the street, ending the straight elevation. This drove the design to be a combination of classical elements, such as arches, with modern architectural textures, drawing inspiration from Japanese and Scandinavian architecture.Text description provided by the architects.New Noe line’s building in Stra3ord Avenue,Colombo05, was a rapid commercial development that had a limited frame of execution, aiming to open its doors to the growing clientele by December.Within the three-month period of the project, the existing building was renovated and expanded with an additional steel structure. The choice of material came with the =ght construc=on =me and the desire to create a lightweight structure to carry this feminine enclosure. It was a necessity to reach the relaxation we crave in this restless society and ensure that is the perceived feeling of each and every space. The color scheme and accessories of the main areas were selected and positioned in order to be efficient and inviting, exuding the vibe of a resort.As the majority of the clientele is female, the feminine embodiment of features can easily be referred to, creating a rhythm ideal for the afore-men=oned resort-like environment. This new renova=on and extension allowed a 40 % increment in capacity for the establishment, all while founding its authen=c style and stature in the field in an architectural format.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data