logo

Noelville Landfill Improvement Program

Sector: Hydro • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

-Construction of storm water management pond: Constructed as per Compliance Approval 1428-92RP2N. Constructed completed with forebay, two 600mm diameter inlet culverts, and one 1200mm diameter manhole outlet structure with a 600mm outlet pipe, and a 3m wide overflow spillway. Perimeter ditches to be shaped along eastern/northern limit of future waste, involving excavation, grading and seeding. -Li

Project Information FAQ

Project Information

5 Q
The project “Noelville Landfill Improvement Program” is an infrastructure initiative in the Hydro sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

-Construction of storm water management pond: Constructed as per Compliance Approval 1428-92RP2N. Constructed completed with forebay, two 600mm diameter inlet culverts, and one 1200mm diameter manhole outlet structure with a 600mm outlet pipe, and a 3m wide overflow spillway. Perimeter ditches to be shaped along eastern/northern limit of future waste, involving excavation, grading and seeding. -Litter fence installation: installed immediately outside the existing limit of waste, spanning a 240m section. The proposed litter fence will be constructed using recycled hydro poles and litter (debris) netting with a 100mm x 100mm opening. The little fence will extend to a height of 4.5m. -Vegetated perimeter screening berms: constructed to a height of 2m with 3H:1V side slopes. Constructed with surplus material excavated in construction of storm water management pond, and vegetated with hydroseeding and tree planting. A 140m row of coniferous trees will be planted along the western boundary. -Automated gate system: a boom style barrier gate system will be installed within the access road, adjacent to the scale house. The barrier system will consist of two boom barriers, controlled from a single base. The barriers will be operated by a push button system, under the Site Operator’s control. The system will include installation of the gates, base, conduit and wiring, as well as electrical connections and programming. -Final cover: Final cover will be installed over completed areas (IE areas having reached approved final waste grades) within the southern portion of the landfill, covering an estimated area of 15000m2. The final cover will consist of 0.15m of vegetated topsoil, 0.15m sand drainage layer, a geocomposite clay liner, non-woven textile, and 0.5m of common fill material. There are also engineering services included within the cost figures.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data