logo

Nolan Culvert Replacement

Sector: Water Supply and Storage • Location: Rockland, Ontario, Canada

Source: Dodge USA

Project
Closed

The work generally includes but is not limited to the Rehabilitation on two Existing Culvert (Tucker Road and Guindon Road) 1800 , 18m long with centrifugally cast concrete pipe. Also included in the tender is the replacement of an existing culvert on Nolan Road, the contractor shall be responsible for the design, supply, and installation of a new 2.0m dia. x 20m long polymerized galvanized corrug

Status
Closed
Sector
Water Supply and Storage, Bridge, Cement, Road, Steel, Waste Processing and Treatment, Mass Transit, Government, Rail, Metal, Commercial
Location
Rockland, Ontario, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Nolan Culvert Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Nolan Culvert Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Rockland, Ontario, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The work generally includes but is not limited to the Rehabilitation on two Existing Culvert (Tucker Road and Guindon Road) 1800 , 18m long with centrifugally cast concrete pipe. Also included in the tender is the replacement of an existing culvert on Nolan Road, the contractor shall be responsible for the design, supply, and installation of a new 2.0m dia. x 20m long polymerized galvanized corrugated steel pipe culvert, including the design, supply, and installation of a new mechanically sta...

Procurement method

Budget

Location

Country

Canada

State

Ontario

City

Rockland

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Bridge, Cement, Road, Steel, Waste Processing and Treatment, Mass Transit, Government, Rail, Metal, Commercial

Article published date

2024-02-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project