Nolanville Shared Use Path Improvements Phase II
Sector: Water Supply and Storage • Location: Texas, United States of America
Source: Dodge USA
This project includes, but is not limited to concrete shared use path, concrete culvert extensions, street widening, concrete curb installation, street rehabilitation and HMAC overlay, striping, SWPPP installations, prefabricated bridge structure installation, temporary traffic control, etc.
- Status
- Prospective
- Sector
- Water Supply and Storage, Bridge, Cement, Road, Waste Processing and Treatment, Car parking, Automotive, Commercial
- Location
- Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Nolanville Shared Use Path Improvements Phase II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Design Development |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project includes, but is not limited to concrete shared use path, concrete culvert extensions, street widening, concrete curb installation, street rehabilitation and HMAC overlay, striping, SWPPP installations, prefabricated bridge structure installation, temporary traffic control, etc. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Bridge, Cement, Road, Waste Processing and Treatment, Car parking, Automotive, Commercial |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
