NOONDAY CREEK TRAIL CONNECTOR FEASIBILITY STUDY-SCOPING ONLY
Sector: Commercial • Location: Woodstock, Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
The gap between the existing southern end of the Woodstock segment at Hwy 92 and the existing northern end of the Cobb County segment is approximately 4 miles. The City of Woodstock and Cherokee County have identified the connection south to Noonday Park as a critical connection to link these two trails and provide a network of over 10 miles of multi-use trail, which ties into a much larger syst
- Status
- Closed
- Sector
- Commercial, Car parking, Road, Government, Automotive
- Location
- Woodstock, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about NOONDAY CREEK TRAIL CONNECTOR FEASIBILITY STUDY-SCOPING ONLY
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The gap between the existing southern end of the Woodstock segment at Hwy 92 and the existing northern end of the Cobb County segment is approximately 4 miles. The City of Woodstock and Cherokee County have identified the connection south to Noonday Park as a critical connection to link these two trails and provide a network of over 10 miles of multi-use trail, which ties into a much larger system. This scoping project is to study the approximately 2 mile segment from Hwy 92 in Woodstock to Shallowford Road/Noonday Park in Cobb County. It will help to learn what alternatives it has to the route given the physical constraints that exist along the corridor. The goal of this study is to provide pre-engineered documentation that can be used to obtain funding and the necessary property easements and/or acquisitions to finalize design engineering for construction or be able to do a design-build project for this segment. |
Procurement method |
Location
Country | United States of America (USA) |
State | Georgia |
City | Woodstock |
Source
Source reliability | High |
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Commercial, Car parking, Road, Government, Automotive |
Article published date | 2024-01-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
