logo

Noor IV photovoltaic power plant

Sector: Commercial • Location: Morocco

Source: KFW Bank aus Verantwortung

Project
Completed

The FC measure includes the construction of the Noor IV photovoltaic power plant at the Ouarzazate site in Morocco with an installed capacity of around 70 MW. It is the first large-scale photovoltaic power plant in Morocco. As part of the Moroccan solar plan, the project is part of the Ouarzazate solar complex and complements the solar thermal power plants at the same location co-financed by the F

Project Information FAQ

Project Information

5 Q
The project “Noor IV photovoltaic power plant” is an infrastructure initiative in the Commercial sector, located in Morocco. Taiyo aggregates data on it from KFW Bank aus Verantwortung.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The FC measure includes the construction of the Noor IV photovoltaic power plant at the Ouarzazate site in Morocco with an installed capacity of around 70 MW. It is the first large-scale photovoltaic power plant in Morocco. As part of the Moroccan solar plan, the project is part of the Ouarzazate solar complex and complements the solar thermal power plants at the same location co-financed by the FC. The estimated total cost of the photovoltaic power plant, including development and connection infrastructure, is around EUR 80 million. The FC contribution consists of a low-interest loan of EUR 60 million with funds from the Initiative for Climate and Environmental Protection (IKLU). After commercial commissioning in 2017, at least 119 GWh of electricity are to be generated annually and around 56,000 t of CO2 are to be saved per year. The project thus makes a significant contribution to supplying households, public institutions and companies connected to the Moroccan power grid with electricity in a safe and climate-friendly manner (DC program objective). As with the previous projects, the project sponsor and borrower is the public agency for solar energy, Masen (Moroccan Agency for Sustainable Energy). Implementation and operation are carried out within the framework of a public-private partnership (PPP) by a project company that Masen founded with the private consortium identified through a tender.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data