Nordlink HVDC Interconnection
Sector: Power Transmission • Location: Germany
Source: Hitachi Energy
Enabling the exchange of renewable energy between Norway and Germany with the world’s longest international HVDC VSC interconnector.
- Status
- Closed
- Sector
- Power Transmission, Power Generation (CCGT)
- Location
- Germany
- Updated
- 22 Jul 2026
- Source
- Hitachi Energy
ConstructChat
Ask ConstructChat about Nordlink HVDC Interconnection
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Enabling the exchange of renewable energy between Norway and Germany with the world’s longest international HVDC VSC interconnector. |
Original sector | Energy |
Location
Country | Germany |
Source
Source | Hitachi Energy |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Power Generation (CCGT) |
Article published date | 2025-03-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
