NORDLINK HVDC PROJECT
Signed · Norway, Germany
Source: European Investment Bank (EIB)
The proposed project concerns the implementation of a bipolar high voltage direct current (HVDC) link connecting Norway and Germany across the North Sea. The project will have a rated capacity of 1400 MW, terminal voltage of +/- 500 kV and a total length of around 623 km.
- Status
- Under Construction
- Sector
- Road, Power Transmission, Power Generation (CCGT), Government
- Location
- Norway
- Updated
- 22 Jul 2026
- Source
- European Investment Bank (EIB)
ConstructChat
Ask ConstructChat about NORDLINK HVDC PROJECT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | signed |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project concerns the implementation of a bipolar high voltage direct current (HVDC) link connecting Norway and Germany across the North Sea. The project will have a rated capacity of 1400 MW, terminal voltage of +/- 500 kV and a total length of around 623 km. |
Original sector | Energy |
Location
Country | Norway |
Source
Source | European Investment Bank (EIB) |
URL |
More Details
Record type | Project |
Sector | Road, Power Transmission, Power Generation (CCGT), Government |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
