logo
ProjectSigned

NORDLINK HVDC PROJECT

Signed · Norway, Germany

Source: European Investment Bank (EIB)

The proposed project concerns the implementation of a bipolar high voltage direct current (HVDC) link connecting Norway and Germany across the North Sea. The project will have a rated capacity of 1400 MW, terminal voltage of +/- 500 kV and a total length of around 623 km.

Status
Under Construction
Sector
Road, Power Transmission, Power Generation (CCGT), Government
Location
Norway
Updated
22 Jul 2026
Source
European Investment Bank (EIB)

ConstructChat

Ask ConstructChat about NORDLINK HVDC PROJECT

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “NORDLINK HVDC PROJECT” is an infrastructure initiative in the Road sector, located in Norway, Germany. Taiyo aggregates data on it from European Investment Bank (EIB).

Participants

Sponsoring Agency

Status

Original status

signed

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed project concerns the implementation of a bipolar high voltage direct current (HVDC) link connecting Norway and Germany across the North Sea. The project will have a rated capacity of 1400 MW, terminal voltage of +/- 500 kV and a total length of around 623 km.

Original sector

Energy

Location

Country

Norway

Source

Source

European Investment Bank (EIB)

URL

More Details

Record type

Project

Sector

Road, Power Transmission, Power Generation (CCGT), Government

Article published date

2025-07-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project