Norfolk CSRM Floodwall Construction Phase 1A SOURCES SOUGHT
Sector: Water Supply and Storage • Location: Norfolk, Virginia, United States of America
Source: Dodge
The citywide, Norfolk CSRM Program is split into five (5) implementation phases. Phase 1 covers the downtown Norfolk area which extends from Ghent through Downtown Norfolk, connecting to the Campostella off-ramp. Phase 1 is split into Phases 1A, 1B, and 1C/D. Phase 1A is split into three acquisitions: (1) Phase 1A Floodwall (DBB), (2) Harbor Park Pump Station (Design-Build), and (3) Newton s Creek
- Status
- Closed
- Sector
- Water Supply and Storage, Car parking, Waste Processing and Treatment, Automotive, Commercial, Seaport
- Location
- Norfolk, Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Norfolk CSRM Floodwall Construction Phase 1A SOURCES SOUGHT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The citywide, Norfolk CSRM Program is split into five (5) implementation phases. Phase 1 covers the downtown Norfolk area which extends from Ghent through Downtown Norfolk, connecting to the Campostella off-ramp. Phase 1 is split into Phases 1A, 1B, and 1C/D. Phase 1A is split into three acquisitions: (1) Phase 1A Floodwall (DBB), (2) Harbor Park Pump Station (Design-Build), and (3) Newton s Creek Pump Station (DBB). This SATOC Construction Contract is intended to cover the Phase 1A Floodwall... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Virginia |
City | Norfolk |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Car parking, Waste Processing and Treatment, Automotive, Commercial, Seaport |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
