NorQuest College Downtown Campus Develop PH 3
Closed · Alberta · Last reported Aug 2022
Source: Dodge USA
Phase 3 of the NorQuest College Downtown Campus Development Project (DCDP) includes 3 scopes of redevelopment. Scope 1 includes the redevelopment of the Civic Employees Legacy Tower (CELT streetscape and landscaping. Scope 2 includes the demolition of Centre 102, a two-storey building with a sub-basement mechanical room. Scope 3 includes the design of a new publicly accessible green space on the s
- Status
- Closed
- Sector
- Commercial, Education, Government
- Location
- Edmonton, Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about NorQuest College Downtown Campus Develop PH 3
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Phase 3 of the NorQuest College Downtown Campus Development Project (DCDP) includes 3 scopes of redevelopment. Scope 1 includes the redevelopment of the Civic Employees Legacy Tower (CELT streetscape and landscaping. Scope 2 includes the demolition of Centre 102, a two-storey building with a sub-basement mechanical room. Scope 3 includes the design of a new publicly accessible green space on the site of Centre 102 demolition which will enhance the east, south and west public realm at the base... |
Procurement method | |
Budget |
Location
Country | Canada |
State | Alberta |
City | Edmonton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Education, Government |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Canada
- Site C Worker Accommodation
- Transport and Rescue Squadron Hangar Facility - 19 Wing CFB Comox 442
- Thornwood Residences Phase 2
- Canadian Tire Corporate Office Interior Renovation
- St. Stephen Border Crossing
- Aqsarniit Hotel and Convention Centre
- Safeway Refrigerated Warehouse
- International Brotherhood of Boilermakers Training Centre and Union Hall
