In November 2008, Consorcio Integracao Norte Brasil Energia, an association of the two state-owned companies Eletrosul (24.5%) and Eletronorte (24.5%), the spanish company Abengoa (25.5%) and the brazilian company Andrade Gutierrez (25.5%), was awarded in a competitive bidding process the contract to build and operate 2375 km of transmission lines and substations located in the states of Mato Gro

Project Information FAQ

Project Information

4 Q
The project “Norte Brasil Transmissora de Energia” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In November 2008, Consorcio Integracao Norte Brasil Energia, an association of the two state-owned companies Eletrosul (24.5%) and Eletronorte (24.5%), the spanish company Abengoa (25.5%) and the brazilian company Andrade Gutierrez (25.5%), was awarded in a competitive bidding process the contract to build and operate 2375 km of transmission lines and substations located in the states of Mato Grosso, Minais Gerais, Sao Paulo, Rondonia and Goias. Besides Consorcio Intergracao Norte Brasil Energia, four other companies took part in the contest: Odebrecht, Camargo Correa and Consorcio TME Trans (Neoenergia, 34%; Alupar, 22%; CEMIG 22%; and Empresa Amazonense de Transmissao, 22%). The bidding criteria set by the regulatory agency ANEEL was the lowest required annual revenue. Consorcio Integracao Norte Brasil Energia presented the lowest offer, a total value of US$ 94.6 million (BRL 173.3 million), 6% the ceiling set by the regulatory agency. The contract was signed in February 2009, and the sponsors created the company Norte Brasil Transmissora de Energia S.A. to lead the project during the 30-year contract period. In August 2010, the shareholding structure was modified as follows: Eletrosul (24.5%), Eletronorte (24.5%) and the spanish company Abengoa (51%). The sponsor committed to invest US$ 919.1 million (BRL 1.5 billion) in the transmission line. The construction works commenced in 2010. In November 2010, the sponsor was granted a US$ 167,6 million (BRL 295 million) loan from BNDES. In June 2011, BNDES granted an additional US$ 309.7 million (BRL 505.5 million) loan to the project company. In August 2012, BNDES approved another loan package amounting to US$ 537.9 million (BRL 1.05 billion). Commercial operations commenced in November 2014.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data