logo
ProjectClosed

Norte Grande Electricity Transmission Program

One of 10,000+ projects Taiyo tracks in Argentina.

Source: Inter-American Development Bank (IADB)

The main objective of the Project is to guarantee the coverage of the increasing power demand and the security of the Argentinean Interconnection System (SADI), with the object of contributing to the continuous development of the productive sectors and elevating the standard of life of the population, by rationally making use of the available generation resources of the country. The specific objec

Status
Closed
Sector
Power Generation (CCGT), Government
Location
Argentina
Updated
22 Jul 2026
Source
Inter-American Development Bank (IADB)

ConstructChat

Ask ConstructChat about Norte Grande Electricity Transmission Program

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Norte Grande Electricity Transmission Program” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Argentina. Taiyo aggregates data on it from Inter-American Development Bank (IADB).

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The main objective of the Project is to guarantee the coverage of the increasing power demand and the security of the Argentinean Interconnection System (SADI), with the object of contributing to the continuous development of the productive sectors and elevating the standard of life of the population, by rationally making use of the available generation resources of the country. The specific objectives are: i) to interconnect the electrical systems of the Northeast and Northwest Argentinean regions (NOA – NEA) by using a line of extra high tension (LEAT 500kV and associated Transformation Stations) so it can permit and promote the energy exchange between both regions, improving the prices and increasing the quality and security of the electrical provision, in particular for the macro region of Norte Grande; and ii) to consolidate and expand the regional communication nets (high and med tension lines smaller than 500kV with its respective associated transformation stations), laying the foundations for the productive and social development through giving solution to the problems that attempt against the security and reliability of these systems.

Original sector

ENERGY

Budget

Location

Country

Argentina

Source

Source

Inter-American Development Bank (IADB)

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Government

Article published date

2025-06-02

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project