logo

Norte Sul Railroad

Sector: Mass Transit • Location: Brazil

Source: World Bank Group

Project
Active

In December 2007, Companhia Vale do Rio Doce SA (CVRD) signed a 30 year concession contract to operate, maintain and modernize a 720 km stretch of the Norte Sul railroad with VALEC, a state-owned company run by the federal Ministry of Transportation. The stretch was to connect Acailandia, in Brazil's northeastern Maranhao state, with Palmas, in the northeastern Tocantins state. The Norte Sul railw

Status
Prospective
Sector
Mass Transit, Steel, Metal, Seaport, Rail, Government, Commercial
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Norte Sul Railroad

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Norte Sul Railroad” is an infrastructure initiative in the Mass Transit sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In December 2007, Companhia Vale do Rio Doce SA (CVRD) signed a 30 year concession contract to operate, maintain and modernize a 720 km stretch of the Norte Sul railroad with VALEC, a state-owned company run by the federal Ministry of Transportation. The stretch was to connect Acailandia, in Brazil's northeastern Maranhao state, with Palmas, in the northeastern Tocantins state. The Norte Sul railway was to connect with CVRD's existing railway, which ran from the company's iron ore mine Carajas and enabled access to the Itaqui port in Sao Luis, where CVRD has the Ponta da Madeira maritime terminal. See Carajas Railway, project 2084. The contract was awarded at a public auction held on October 3, 2007 at Sao Paulo's Bovespa Stock Exchange. Companhia Vale do Rio Doce SA (CVRD) was the only bidder and offered the minimum bid of 1.48 billion Brazilian reals (US $760 million) for the concession rights. The first installment was paid with the contract signing in December 2007. The majority of the payment was to be used by VALEC to construct the unfinished portions of the railway. A stretch of 133.5 kilometers between Estreito and Araguaina, in the state of Tocantins was already was constructed by the VALEC, and was to be operated immediately by CVRD. Another 213.2 kilometers of railway, connecting the cities of Araguaina and Guarai, both in the state of Tocantins, was expected to be completed by December of 2008. VALEC had until December of 2009 to finish the final stretch of 148.3 kilometers between Guarai and Palmas. CVRD was to operate these assets as they became available. CVRD also committed approximately US $33.9 million to modernize the railroad facilities.

Original sector

Transport

Procurement method

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Mass Transit, Steel, Metal, Seaport, Rail, Government, Commercial

Article published date

2024-09-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project