North and South Wastewater Treatment Plants in Chihuahua rehabilitation and upgrade
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The project involves the rehabilitation and upgrade of North and South Wastewater Treatment Plants in Chihuahua city, Chihuahua state, Mexico. The project also includes designing, installing and operating a cogeneration facility in the South Wastewater Treatment Plant. Currently, the plants treat 1,750 lps (39.9 mgd) of wastewater. This project will provide 625 lps (14.3 mgd or 65,000 cubic meters
- Status
- Prospective
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Power Transmission, Government, Manufacturing (Industrial), Power Generation (CCGT), Commercial
- Location
- Mexico
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about North and South Wastewater Treatment Plants in Chihuahua rehabilitation and upgrade
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the rehabilitation and upgrade of North and South Wastewater Treatment Plants in Chihuahua city, Chihuahua state, Mexico. The project also includes designing, installing and operating a cogeneration facility in the South Wastewater Treatment Plant. Currently, the plants treat 1,750 lps (39.9 mgd) of wastewater. This project will provide 625 lps (14.3 mgd or 65,000 cubic meters per day) in additional treatment capacity. Aguas de Reuso y Energia Renovable, S.A. de C.V. is the project SPV, formed by La Peninsular Companía Constructora, S.A. de C.V., Suez Medio Ambiente México, S.A. de C.V., Suez International, S.A.S., and Grupo Acuanovus, S.A. de C.V. The consortium was awarded an 11-year BOT contract by the municipal water utility, Junta Municipal de Agua y Saneamiento de Chihuahua. The total project cost is $14.7 million. North American Development Bank (NADB) agreed to provide up to MXN 233.4 million ($11.2 million). Financial close was reached in January 2020. https://www.nadb.org/our-projects/infrastructure-projects/rehabilitation-and-upgrade-of-the-north-and-south-wastewater-treatment-plants-in-chihuahua-chihuahua https://basquetrade.spri.eus/en/commercial-opportunities/mexico-en/nadb-loans-us11-2-million-for-upgrade-wastewater-treatment-plants-in-chihuahua-mexico/ https://smartwatermagazine.com/news/north-american-development-bank-nadb/nadb-loans-us112-million-upgrade-wastewater-treatment |
Original sector | Water and sewerage |
Budget |
Location
Country | Mexico |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Power Transmission, Government, Manufacturing (Industrial), Power Generation (CCGT), Commercial |
Article published date | 2024-09-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
