North Beach Sand Replenishment Phase 2
Sector: Commercial • Location: Fountain Valley, California, United States of America
Source: Dodge USA
This project generally involves the haul of 17,000 cubic yards of sand from a loading site in Fountain Valley along the Santa Ana River to the project site location at North Beach in San Clemente. As the sand is delivered, it is to be spread about the beach so as to increase the available coastline. This work includes, but is not limited to activities such as trucking, traffic control, BMPs, gradi
- Status
- Prospective
- Sector
- Commercial, Consumer Products, Government, Manufacturing (Industrial)
- Location
- Fountain Valley, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about North Beach Sand Replenishment Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project generally involves the haul of 17,000 cubic yards of sand from a loading site in Fountain Valley along the Santa Ana River to the project site location at North Beach in San Clemente. As the sand is delivered, it is to be spread about the beach so as to increase the available coastline. This work includes, but is not limited to activities such as trucking, traffic control, BMPs, grading of the delivered sand, site control, construction signage, shoring of an existing channel deck... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Fountain Valley |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Consumer Products, Government, Manufacturing (Industrial) |
Article published date | 2024-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
