North Bowl Ev Chargers
Sector: Manufacturing (Industrial) • Location: Merced, California, United States of America
Source: Dodge
North Bowl EV Chargers Install new EV chargers and rework ADA parking spaces into accessible EV charger locations in the North Bowl parking lot. Alternate 1, 2 & 3 have been identified for the labor and materials for installation of EV chargers and corresponding site work as identified in the drawings.
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Electric Vehicles (EVs), Power Generation (CCGT), Automotive, Car parking, Commercial
- Location
- Merced, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about North Bowl Ev Chargers
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | North Bowl EV Chargers Install new EV chargers and rework ADA parking spaces into accessible EV charger locations in the North Bowl parking lot. Alternate 1, 2 & 3 have been identified for the labor and materials for installation of EV chargers and corresponding site work as identified in the drawings. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Merced |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Electric Vehicles (EVs), Power Generation (CCGT), Automotive, Car parking, Commercial |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
