logo

North Campus Roadway Paving Phase II

Sector: Water Supply and Storage • Location: Buffalo, New York, United States of America

Source: Dodge USA

Project
Closed

The Contractor shall submit unit prices in the proposal which will be used as a cost basis to address isolated full depth asphalt pavement repairs, remove and replace damaged granite curb, adjust existing utility manhole frames and covers, rehabilitate existing drainage structures, provide for asphalt price adjustment, make changes to, and evaluate possible alternatives in the work.

Status
Closed
Sector
Water Supply and Storage, Road, Commercial, Waste Processing and Treatment, Power Transmission, Power Generation (CCGT)
Location
Buffalo, New York, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about North Campus Roadway Paving Phase II

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “North Campus Roadway Paving Phase II” is an infrastructure initiative in the Water Supply and Storage sector, located in Buffalo, New York, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Contractor shall submit unit prices in the proposal which will be used as a cost basis to address isolated full depth asphalt pavement repairs, remove and replace damaged granite curb, adjust existing utility manhole frames and covers, rehabilitate existing drainage structures, provide for asphalt price adjustment, make changes to, and evaluate possible alternatives in the work.

Procurement method

Budget

Location

Country

United States of America (USA)

State

New York

City

Buffalo

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Road, Commercial, Waste Processing and Treatment, Power Transmission, Power Generation (CCGT)

Article published date

2024-12-02

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project