logo
ProjectClosed

North College Alley Utilities - Replacement

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

The project will include the following described construction: The furnishing. installing, and testing of approximately 320 linear feet of 10-inch interceptor gravity sewer, manholes, casing pipes by open cut. including unclassified excavation. The furnishing, installing, and testing of approximately 145 linear feet of 1 114-inch sewer force main by open cut, manholes, casing pipes by open cut, in

Status
Closed
Sector
Water Supply and Storage, Education, Commercial, Waste Processing and Treatment, Power Transmission, Power Generation (CCGT), Government
Location
Lebanon, Tennessee, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about North College Alley Utilities - Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “North College Alley Utilities - Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Lebanon, Tennessee, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project will include the following described construction: The furnishing. installing, and testing of approximately 320 linear feet of 10-inch interceptor gravity sewer, manholes, casing pipes by open cut. including unclassified excavation. The furnishing, installing, and testing of approximately 145 linear feet of 1 114-inch sewer force main by open cut, manholes, casing pipes by open cut, including unclassified excavation. backfill, tie-ins, fittings, installing detection tape with trac...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Tennessee

City

Lebanon

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Education, Commercial, Waste Processing and Treatment, Power Transmission, Power Generation (CCGT), Government

Article published date

2024-11-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project