North Country Trail Pedestrian Bridge Replacement REBID
Sector: Water Supply and Storage • Location: Mellen, Wisconsin, United States of America
Source: Dodge USA
In general, the work consists of: construction of a new pedestrian trail bridge and ford waterway crossings. 1 2 The bridge is a 60-foot single-span glulam timber structure on geosynthetic reinforced soil abutments generally similar to US Forest Service single-log trail bridges. Construction of the ford requires shaping the 3 riverbanks and installing precast concrete articulated mats acting as re
- Status
- Closed
- Sector
- Water Supply and Storage, Mass Transit, Cement, Bridge, Rail, Government, Forest Products and Packaging, Commercial
- Location
- Mellen, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about North Country Trail Pedestrian Bridge Replacement REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In general, the work consists of: construction of a new pedestrian trail bridge and ford waterway crossings. 1 2 The bridge is a 60-foot single-span glulam timber structure on geosynthetic reinforced soil abutments generally similar to US Forest Service single-log trail bridges. Construction of the ford requires shaping the 3 riverbanks and installing precast concrete articulated mats acting as revetment and access ramps. Other 4 work includes erosion control, site clearing, cofferdams, and r... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Mellen |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Mass Transit, Cement, Bridge, Rail, Government, Forest Products and Packaging, Commercial |
Article published date | 2024-09-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
