logo
ProjectUnder Construction

North Creek Culvert Replacement Project

Under construction · Washington · Last reported May 2026

Source: Tacoma News Tribune

The city of Gig Harbor plans to remove the North Creek culvert, a 146-foot long concrete tunnel under Harborview Drive, to restore fish passage and build a 140-foot concrete bridge allowing the creek to flow freely. The project includes stream restoration and trail extension through Donkey Creek Park. The project is complicated by a connected fish hatchery, and the city is postponing decisions on

Status
Under Construction
Sector
Water Supply and Storage, Bridge, Seaport, Cement, Tunnel
Location
Gig Harbor, Washington, United States of America
Updated
22 Jul 2026
Source
Tacoma News Tribune

ConstructChat

Ask ConstructChat about North Creek Culvert Replacement Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “North Creek Culvert Replacement Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Gig Harbor, Washington, United States. Taiyo aggregates data on it from Tacoma News Tribune.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The city of Gig Harbor plans to remove the North Creek culvert, a 146-foot long concrete tunnel under Harborview Drive, to restore fish passage and build a 140-foot concrete bridge allowing the creek to flow freely. The project includes stream restoration and trail extension through Donkey Creek Park. The project is complicated by a connected fish hatchery, and the city is postponing decisions on alternatives for the hatchery to avoid delays and maintain grant eligibility.

Original sector

Built Environment

Budget

Location

Country

United States of America (USA)

State

Washington

City

Gig Harbor

Source

Source

Tacoma News Tribune

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Bridge, Seaport, Cement, Tunnel

Article published date

2026-05-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project