North Creek Trail Section 4-Phase 2 & 3
Sector: Bridge • Location: Bothell, Washington, United States of America
Source: City of Bothell
Completing the last segment of the North Creek Trail within Bothell's city limits., This project will construct a trail along the south side of 208th St SE between the 9th Ave SE/SR 524 intersection and the current end of North Creek Trail Section 3 just west of the Bothell-Everett Highway (SR 527)., This will construct about 0.58 miles of 10-foot wide separated paved trail with a planter strip, p
- Status
- Prospective
- Sector
- Bridge, Car parking, Power Transmission, Road, Automotive, Water Supply and Storage, Power Generation (CCGT), Commercial, Residential, Government
- Location
- Bothell, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- City of Bothell
ConstructChat
Ask ConstructChat about North Creek Trail Section 4-Phase 2 & 3
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Completing the last segment of the North Creek Trail within Bothell's city limits., This project will construct a trail along the south side of 208th St SE between the 9th Ave SE/SR 524 intersection and the current end of North Creek Trail Section 3 just west of the Bothell-Everett Highway (SR 527)., This will construct about 0.58 miles of 10-foot wide separated paved trail with a planter strip, pedestrian bridge, structural earth wall, wider culverts, a signal upgrade, ramp work, street light relocation, wetland mitigation, and utility adjustments., Completion of the North Creek Trail system will improve safety for pedestrians and bicyclists as well as encourage non-motorized travel between business centers, transit stops, parks, and employment centers., The project is being spilt into 3 phases due to its size, complexity and cost. Phase 1 was completed in Summer of 2022. Phase 2 and 3 construction is expected to start in Late Winter or early Spring of 2023. The $7.5 million North Creek Section 4 project is funded by a mix of Federal, State and local grant funds., |
Location
Country | United States of America (USA) |
State | Washington |
City | Bothell |
Source
Source reliability | High |
Source | City of Bothell |
URL |
More Details
Record type | Project |
Sector | Bridge, Car parking, Power Transmission, Road, Automotive, Water Supply and Storage, Power Generation (CCGT), Commercial, Residential, Government |
Article published date | 2023-10-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project