North District of Changchun Economic and Technological Development Zone infrastructure project

Sector: Road • Location: China

Source: World Bank Group

Project
Active

The project includes: 14 road construction projects such as “Chengyi Road Phase I Road Project” in Changchun Xinglong Comprehensive Bonded Zone North District, and Changchun Xinglong In the comprehensive bonded area in 2019, 11 road construction projects such as B13 Street in the North District (referred to as “the second phase road project of the comprehensive insurance zone”), and the constructi

Project Information FAQ

Project Information

5 Q
The project “North District of Changchun Economic and Technological Development Zone infrastructure project” is an infrastructure initiative in the Road sector, located in China. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project includes: 14 road construction projects such as “Chengyi Road Phase I Road Project” in Changchun Xinglong Comprehensive Bonded Zone North District, and Changchun Xinglong In the comprehensive bonded area in 2019, 11 road construction projects such as B13 Street in the North District (referred to as “the second phase road project of the comprehensive insurance zone”), and the construction of seven roads in the Changchun Xinglong Comprehensive Bonded Zone in 2020, the second road construction project (referred to as “the comprehensive insurance zone” The four phases of the road project "), the Changchun Xinglong Comprehensive Bonded Zone, 2018 Zhaoqing Street and other seven road construction projects (referred to as "the comprehensive construction zone road construction project") and other four sub-projects, the cooperation period of 15 years, including the construction period of 3 years, SPV is Changchun Modern Zhongyi Construction Project Management Co., Ltd. a JV between the sponsors Jilin Province Modern Transportation Construction Co., Ltd. (60%), Zhongqing Construction Co., Ltd. (39.99%) and Jilin Huayi Road Construction Group Co., Ltd. (0.01%). Type of concession is BOT. Financial close took place on March 5, 2019. http://www.cpppc.org:8083/efmisweb/ppp/projectLibrary/getProjInfoNational.do?projId=9fd81edccb40406e9234a72a57314ef0

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data