North East Link road PPP project in Melbourne
Sector: Road • Location: Australia
Source: InfraPPPWorld
The project involves the design, construction, financing, operation and maintenance of a new 7km freeway between Watsonia and Bulleen Road; twin three-lane tunnels, approximately 6km in length passing under Banyule Flats and the Yarra River; and two new interchanges at Manningham Road and Lower Plenty Road, located in north-east Melbourne, the state capital of Victoria, south-east Australia.The se
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | financial close |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project involves the design, construction, financing, operation and maintenance of a new 7km freeway between Watsonia and Bulleen Road; twin three-lane tunnels, approximately 6km in length passing under Banyule Flats and the Yarra River; and two new interchanges at Manningham Road and Lower Plenty Road, located in north-east Melbourne, the state capital of Victoria, south-east Australia.The selected private partner will also deliver the ventilation, fire, life and safety and traffic management systems within the tunnels; an intelligent transport system across the entire project corridor; an operations and maintenance control system, motorway control building and backup facilities; toll gantries and tolling road side equipment; noise walls, shared use paths, landscaping and urban design.The project constitutes the Primary Package of the North East Link. The selected private partner will also operate and maintain works delivered through subsequent Secondary Packages, which will cover upgrades to existing roads near the new freeway.The project will fix the missing link between the Eastern Freeway and the M80 Ring Road – slashing travel times and taking more than 15,000 trucks a day off local roads and provide a faster trip to the airport from the east. It will also upgrade the Eastern Freeway to streamline traffic flow and reduce congestion and build a new dedicated busway along the Eastern Freeway – slashing travel times on this busy corridor by more than 30 percent. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
