North East Link
Sector: Mass Transit • Location: Victoria, Australia
Source: Victorian Infrastructure Plan 2021
North East Link will take thousands of vehicles off local roads, deliver significant travel time savings, increase the capacity of Melbourne’s freight network and finally complete the missing link between the Eastern Freeway and the M80 Ring Road. North East Link will connect with Melbourne’s existing freeways, providing continuous traffic flow conditions for long-distance travel across and thr
- Status
- Prospective
- Sector
- Mass Transit, Road, Automotive, Government
- Location
- Victoria, Australia
- Updated
- 19 Nov 2026
- Source
- Victorian Infrastructure Plan 2021
ConstructChat
Ask ConstructChat about North East Link
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | prospective |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | North East Link will take thousands of vehicles off local roads, deliver significant travel time savings, increase the capacity of Melbourne’s freight network and finally complete the missing link between the Eastern Freeway and the M80 Ring Road. North East Link will connect with Melbourne’s existing freeways, providing continuous traffic flow conditions for long-distance travel across and through Melbourne, with links to key parts of the arterial road network. In addition to providing a safe and efficient freeway connection that removes significant volumes of trucks per day from local and arterial roads, North East Link will: › complet e the ring road between the Eastern Freeway and the M80 Ring Road, connecting the growing northern and south-eastern suburbs › upgr ade the Eastern Freeway with additional lanes and new technology, resulting in considerably faster trips › deliv er a new busway with dedicated express bus lanes along the Eastern Freeway, resulting in 30 per cent faster trips from Doncaster towards the city › deliv er 34 kilometres of walking and cycling paths – nine more kilometres than originally planned. In October 2021 the State parties and the Spark consortium signed an $11.1 billion Public Private Partnership contract for the Primary Package that locks in a 25-year deal to build, operate and maintain the tunnels, with tolls to go back to the State. This initiative is co-funded by the Commonwealth Government. |
Procurement method | |
Budget |
Location
Country | Australia |
State | Victoria |
Source
Source | Victorian Infrastructure Plan 2021 |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Road, Automotive, Government |
Article published date | 2024-12-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
