logo
ProjectProspective

North East Link

Sector: Mass Transit • Location: Victoria, Australia

Source: Victorian Infrastructure Plan 2021

North East Link will take thousands of vehicles off local roads, deliver significant travel time savings, increase the capacity of Melbourne’s freight network and finally complete the missing link between the Eastern Freeway and the M80 Ring Road. North East Link will connect with Melbourne’s existing freeways, providing continuous traffic flow conditions for long-distance travel across and thr

Status
Prospective
Sector
Mass Transit, Road, Automotive, Government
Location
Victoria, Australia
Updated
19 Nov 2026
Source
Victorian Infrastructure Plan 2021

ConstructChat

Ask ConstructChat about North East Link

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “North East Link” is an infrastructure initiative in the Mass Transit sector, located in Victoria, Australia. Taiyo aggregates data on it from Victorian Infrastructure Plan 2021.

Participants

Sponsoring Agency

Status

Original status

prospective

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

North East Link will take thousands of vehicles off local roads, deliver significant travel time savings, increase the capacity of Melbourne’s freight network and finally complete the missing link between the Eastern Freeway and the M80 Ring Road. North East Link will connect with Melbourne’s existing freeways, providing continuous traffic flow conditions for long-distance travel across and through Melbourne, with links to key parts of the arterial road network. In addition to providing a safe and efficient freeway connection that removes significant volumes of trucks per day from local and arterial roads, North East Link will: › complet e the ring road between the Eastern Freeway and the M80 Ring Road, connecting the growing northern and south-eastern suburbs › upgr ade the Eastern Freeway with additional lanes and new technology, resulting in considerably faster trips › deliv er a new busway with dedicated express bus lanes along the Eastern Freeway, resulting in 30 per cent faster trips from Doncaster towards the city › deliv er 34 kilometres of walking and cycling paths – nine more kilometres than originally planned. In October 2021 the State parties and the Spark consortium signed an $11.1 billion Public Private Partnership contract for the Primary Package that locks in a 25-year deal to build, operate and maintain the tunnels, with tolls to go back to the State. This initiative is co-funded by the Commonwealth Government.

Procurement method

Budget

Location

Country

Australia

State

Victoria

Source

Source

Victorian Infrastructure Plan 2021

URL

More Details

Record type

Project

Sector

Mass Transit, Road, Automotive, Government

Article published date

2024-12-31

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project