North Gate Relocation and Access Optimization
One of 10,000+ projects Taiyo tracks in North Carolina.
Source: Dodge USA
The project will construct approximately 4,000 feet of elevated roadway access to the general cargo terminal, relocate the North Gate security checkpoint, install a new gate operating system, improve existing at-grade railroad crossings, construct buildings for badging, guardhouse, and cargo control, construct a truck queuing area, and install EV charging infrastructure and solar panels.. The scop
- Status
- Prospective
- Sector
- Electric Vehicles (EVs), Car parking, Residential, Rail, Bridge, Power Transmission, Solar, Commercial, Road, Water Supply and Storage, Waste Processing and Treatment, Government, Automotive, Power Generation (CCGT), Seaport
- Location
- Wilmington, North Carolina, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about North Gate Relocation and Access Optimization
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The project will construct approximately 4,000 feet of elevated roadway access to the general cargo terminal, relocate the North Gate security checkpoint, install a new gate operating system, improve existing at-grade railroad crossings, construct buildings for badging, guardhouse, and cargo control, construct a truck queuing area, and install EV charging infrastructure and solar panels.. The scope includes all major utility infrastructure, roads, bridges, culverts, parking lots and a badging... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Wilmington |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Electric Vehicles (EVs), Car parking, Residential, Rail, Bridge, Power Transmission, Solar, Commercial, Road, Water Supply and Storage, Waste Processing and Treatment, Government, Automotive, Power Generation (CCGT), Seaport |
Article published date | 2024-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Electric Vehicles (EVs) projects in United States of America
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 20 MDOULES 8 KW INSTALL EV CHARGER
- QLINE Streetcar Overhead Catenary System
- Metropolitan Park
- Sierra Regency Roof Eve Extensions
- 466135 CLOUD PL NE Local Roadway Paving Restoration
- 378944 Alley-47076042 Citywide Alley Restoration
- Community Food Projects Competitive Grant Program
- Hydrogen Delivery Technologies
