logo

North Grove Park Development

Sector: Government • Location: Sycamore, Illinois, United States of America

Source: Dodge USA

Project
Closed

Work generally includes asphalt paving, asphalt color coat, concrete paving, concrete sloped entry, sloped entry with curb, crushed limestone trail, integral curb at walk, curb at playground, engineered wood fiber, playground equipment, picnic shelter, bench, picnic table, game table, playground underdrainage, drain cleanout, mitered drain, shade trees, evergreen trees, native seed mix, and lawn r

Status
Closed
Sector
Government, Cement, Airport, Commercial, Car parking, Manufacturing (Industrial), Road, Waste Processing and Treatment, Automotive
Location
Sycamore, Illinois, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about North Grove Park Development

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “North Grove Park Development” is an infrastructure initiative in the Government sector, located in Sycamore, Illinois, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Work generally includes asphalt paving, asphalt color coat, concrete paving, concrete sloped entry, sloped entry with curb, crushed limestone trail, integral curb at walk, curb at playground, engineered wood fiber, playground equipment, picnic shelter, bench, picnic table, game table, playground underdrainage, drain cleanout, mitered drain, shade trees, evergreen trees, native seed mix, and lawn restoration.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Illinois

City

Sycamore

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Government, Cement, Airport, Commercial, Car parking, Manufacturing (Industrial), Road, Waste Processing and Treatment, Automotive

Article published date

2024-12-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project