North Hog Island Gully Tidal Creek Construction
Sector: Water Supply and Storage • Location: Louisiana, United States of America
Source: Dodge USA
Scope of work : North of Hog Island Gully Tidal Creek Construction Sabine National Wildlife Refuge maintenance dredging material from the Calcasieu Ship Channel . Work consists of tidal creek construction as illustrated below (Figure 2) and shall total no less than 18,174 linear feet in distance
- Status
- Closed
- Sector
- Water Supply and Storage, Seaport, Waste Processing and Treatment, Commercial
- Location
- Louisiana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about North Hog Island Gully Tidal Creek Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope of work : North of Hog Island Gully Tidal Creek Construction Sabine National Wildlife Refuge maintenance dredging material from the Calcasieu Ship Channel . Work consists of tidal creek construction as illustrated below (Figure 2) and shall total no less than 18,174 linear feet in distance |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Louisiana |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Seaport, Waste Processing and Treatment, Commercial |
Article published date | 2024-03-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
