logo

North Karantaka Expressway Limited

Sector: Road • Location: India

Source: World Bank Group

Project
Active

The National Highway Authority of India (NHAI) awarded a 17.5 year concession contract to North Karantaka Expressway Limited (NKEL) in November 2001, to strengthen and widen the 77 km stretch of NH-4 running through the state of Karnataka. The scope of the work included converting the existing 77 km two-lane stretch to four-lane, building six major bridges, twelve minor bridges, 158 culverts, and

Status
Prospective
Sector
Road, Bridge, Government, Commercial
Location
India
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about North Karantaka Expressway Limited

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “North Karantaka Expressway Limited” is an infrastructure initiative in the Road sector, located in India. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The National Highway Authority of India (NHAI) awarded a 17.5 year concession contract to North Karantaka Expressway Limited (NKEL) in November 2001, to strengthen and widen the 77 km stretch of NH-4 running through the state of Karnataka. The scope of the work included converting the existing 77 km two-lane stretch to four-lane, building six major bridges, twelve minor bridges, 158 culverts, and 69 km of service roads. The 17.5 year contract term included the construction time of 30 months. Under the contract, NKEL was compensated for the capital costs and operating costs including returns by way of a fixed semi-annual payment (annuity) from the NHAI during the operation period of 15 years. Under the annuity scheme, the private operator does not collect tolls from the users of the facility. NKEL was joint venture between private Indian firm Punj Lloyd Limited (42 %), Infrastructure Leasing & Financial Services Limited (42 %), and Consolidated Toll Network India Private Limited (16%). NKEL won the competitive tender conducted by NHAI by requesting the lowest annuity amount of US$ 10.6 million. The total cost of the project was estimated at US$ 123 million. The project reached financial closure in December 2001, with a debt equity ratio of 3:1. The loan was arranged by a consortium of 12 banks led by Punjab National Bank. The financing structure was equity of Rs. 1005.81 million, Subordinate Debt of Rs 350.00 million, and Senior Debt of Rs. 4067.42 million Construction began in February 2002 and the roads were expected to be operational by December 2004. Karina advised to enter the annuity amounts as government cash support. None

Original sector

Transport

Procurement method

Budget

Location

Country

India

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Road, Bridge, Government, Commercial

Article published date

2024-09-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project