North Kerry Power Plant
Sector: Wind • Location: Kerry, Ireland
Source: Radio Kerry
An Bórd Pleanála has granted planning permission for a major power plant in North Kerry, consisting of three gas turbine halls with a total capacity of 600 megawatts, along with a battery storage system and substation. This development aims to secure Ireland's energy supply and support a renewables-based electricity grid.
- Status
- Closed
- Sector
- Wind, Energy Storage, LNG, Power Generation (CCGT)
- Location
- Kerry, Ireland
- Updated
- 22 Jul 2026
- Source
- Radio Kerry
ConstructChat
Ask ConstructChat about North Kerry Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | An Bórd Pleanála has granted planning permission for a major power plant in North Kerry, consisting of three gas turbine halls with a total capacity of 600 megawatts, along with a battery storage system and substation. This development aims to secure Ireland's energy supply and support a renewables-based electricity grid. |
Original sector | Energy |
Location
Country | Ireland |
State | Kerry |
Source
Source | Radio Kerry |
URL |
More Details
Record type | Project |
Sector | Wind, Energy Storage, LNG, Power Generation (CCGT) |
Article published date | 2025-03-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
