North Lake Park Bridge Replacement
Sector: Water Supply and Storage • Location: Mansfield, Ohio, United States of America
Source: Dodge USA
NORTH LAKE PARK BRIDGE REPLACEMENT - The removal and replacement of an existing twin cell structure under Park Drive, including removal and replacement of portions of the existing feeder pipe to North Lake. The improvements include concrete curb, full depth pavement, storm sewer and decorative parapet walls. To provide construction inspection and administration services or a bridge replacement at
- Status
- Closed
- Sector
- Water Supply and Storage, Bridge, Cement, Road, Waste Processing and Treatment, Car parking, Automotive, Government, Commercial
- Location
- Mansfield, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about North Lake Park Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | NORTH LAKE PARK BRIDGE REPLACEMENT - The removal and replacement of an existing twin cell structure under Park Drive, including removal and replacement of portions of the existing feeder pipe to North Lake. The improvements include concrete curb, full depth pavement, storm sewer and decorative parapet walls. To provide construction inspection and administration services or a bridge replacement at North Lake Park: North Lake Park Bridge Replacement Description: The removal and replacement of a... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Mansfield |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Bridge, Cement, Road, Waste Processing and Treatment, Car parking, Automotive, Government, Commercial |
Article published date | 2024-04-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
