North Las Vegas Deer Springs Reservoir 2
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The Project includes construction of a 5MG prestressed concrete water reservoir at the northeast corner of Decatur Boulevard and Deer Springs Way in the City of North Las Vegas. The new tank will interconnect to an existing 5MG welded steel reservoir designated as Deer Springs Reservoir #1. To effectuate such addition, the work entails installation of yard pipe, valves, equipment, removals, additi
- Status
- Closed
- Sector
- Water Supply and Storage, Oil and Gas, Power Generation (CCGT), Government, Cement, Commercial, Steel, Metal, Manufacturing (Industrial)
- Location
- North Las Vegas, Nevada, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about North Las Vegas Deer Springs Reservoir 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project includes construction of a 5MG prestressed concrete water reservoir at the northeast corner of Decatur Boulevard and Deer Springs Way in the City of North Las Vegas. The new tank will interconnect to an existing 5MG welded steel reservoir designated as Deer Springs Reservoir #1. To effectuate such addition, the work entails installation of yard pipe, valves, equipment, removals, addition of a perimeter block wall, electrical, grading, and associated appurtenances. The Project shal... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Nevada |
City | North Las Vegas |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Oil and Gas, Power Generation (CCGT), Government, Cement, Commercial, Steel, Metal, Manufacturing (Industrial) |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
