logo

North London Heat and Power Project

Sector: Residential • Location: United Kingdom

Source: National Infrastructure Planning

Project
Post-Decision
	Development of an ERF generating electricity using residual waste as a fuel and capable of an intended electrical output of around 70 MW. The ERF will also be capable of producing low carbon heat. The Edmonton EcoPark (the EcoPark) is a waste management complex of around 16 hectares which is located within the London Borough of Enfield. It is accessed from Advent Way, which leads onto the A406 

Project Information FAQ

Project Information

4 Q
The project “North London Heat and Power Project” is an infrastructure initiative in the Residential sector, located in United Kingdom. Taiyo aggregates data on it from National Infrastructure Planning.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

post-decision

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Development of an ERF generating electricity using residual waste as a fuel and capable of an intended electrical output of around 70 MW. The ERF will also be capable of producing low carbon heat. The Edmonton EcoPark (the EcoPark) is a waste management complex of around 16 hectares which is located within the London Borough of Enfield. It is accessed from Advent Way, which leads onto the A406 North Circular, and the nearest residential properties are located approximately 500m to the east and 600m to the west of the site. The post code for the site is N18 3AG. Please see Existing Context Plan (14047_GAL_A01_1000). It is proposed that the new Energy Recovery Facility (ERF) is located in the northern-most section of the EcoPark currently occupied by the In-vessel compositing, Bulky Waste Recycling Facility, Fuel Preparation Plant and ash recycling facility. Please see the Existing Site Plan (14047_GAL_A01_1001) for the location of existing facilities.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data