NORTH ROAD PROJECT
Closed · Honduras
Source: World Bank Group
The project consists of the construction of a two-lane bituminous surfaced road totaling about 202 kms in length and a bridge with its accesses over the Ulua River and the provision of associated engineering services. The North Road has been given the highest priority both in the National and Central American regional highway investment program. One-third of Honduras' total population live in its
- Status
- Closed
- Sector
- Road, Bridge, Manufacturing (Industrial), Raw Materials, Government
- Location
- Honduras
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about NORTH ROAD PROJECT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of the construction of a two-lane bituminous surfaced road totaling about 202 kms in length and a bridge with its accesses over the Ulua River and the provision of associated engineering services. The North Road has been given the highest priority both in the National and Central American regional highway investment program. One-third of Honduras' total population live in its zone of influence, where the main cities and most of the country's manufacturing and processing facilities are located, as well as about one quarter of the country's total farm area. The North Road will replace a narrow winding gravel road. Assuming a reasonable annual rate of increase in road traffic, the design of the road would ensure adequate capacity to accommodate future traffic subject to certain relatively minor improvements of the pavement to be made in due course. |
Original sector | Transportation |
Location
Country | Honduras |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Bridge, Manufacturing (Industrial), Raw Materials, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
