North-South Commuter Railway (NSCR)

Sector: Rail • Location: Manila, Clark, Calamba, Central Luzon, Metro Manila, Calabarzon, Philippines

Source: Gulf News

Project
Under Construction

The North-South Commuter Railway (NSCR) is the Philippines' largest-ever rail investment aimed to alleviate traffic congestion in Metro Manila. It is a 147-km urban rail system connecting New Clark City to Calamba in Laguna, passing through Central Luzon, Metro Manila, and Calabarzon, with 36 stations. The project includes 51 commuter and 7 limited-express trainsets, operating at speeds up to 130

Status
Under Construction
Sector
Rail, Mass Transit, Airport, Tunnel, Government
Location
Manila, Clark, Calamba, Central Luzon, Metro Manila, Calabarzon, Philippines
Updated
22 Jul 2026
Source
Gulf News

ConstructChat

Ask ConstructChat about North-South Commuter Railway (NSCR)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “North-South Commuter Railway (NSCR)” is an infrastructure initiative in the Rail sector, located in Manila, Clark, Calamba, Central Luzon, Metro Manila, Calabarzon, Philippines. Taiyo aggregates data on it from Gulf News.

Participants

Sponsoring Agency

Company

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The North-South Commuter Railway (NSCR) is the Philippines' largest-ever rail investment aimed to alleviate traffic congestion in Metro Manila. It is a 147-km urban rail system connecting New Clark City to Calamba in Laguna, passing through Central Luzon, Metro Manila, and Calabarzon, with 36 stations. The project includes 51 commuter and 7 limited-express trainsets, operating at speeds up to 130 km/h, and features a 2-km tunnel to Clark Airport for the country's first airport express train. The NSCR is expected to serve around 800,000 daily riders and reduce greenhouse gas emissions by over 60,000 tonnes annually. Partial operations are expected by 2027, with full operations likely by Q2-Q3 2029, though right-of-way issues may delay full operations to 2032.

Original sector

Transportation

Budget

Location

Country

Philippines

State

Central Luzon, Metro Manila, Calabarzon

City

Manila, Clark, Calamba

Source

Source

Gulf News

URL

More Details

Record type

Project

Sector

Rail, Mass Transit, Airport, Tunnel, Government

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project