logo

North-South Electricity Transmission Project

Sector: Power Generation (CCGT) • Location: Kazakhstan

Source: World Bank

Project
Closed

The North-South Electricity Transmission Project for Kazakhstan will ensure that business enterprises and households in southern Kazakhstan have access to adequate, reliable and cost effective supply of electricity. The project consists of the following components: (a) involves construction of a new 475 km 500 kV single circuit overhead line (OHL) from the air-insulated substation Ekibastuz (1,150

Project Information FAQ

Project Information

5 Q
The project “North-South Electricity Transmission Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Kazakhstan. Taiyo aggregates data on it from World Bank.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The North-South Electricity Transmission Project for Kazakhstan will ensure that business enterprises and households in southern Kazakhstan have access to adequate, reliable and cost effective supply of electricity. The project consists of the following components: (a) involves construction of a new 475 km 500 kV single circuit overhead line (OHL) from the air-insulated substation Ekibastuz (1,150/500 kV) to the airinsulated substation Agadyr (500 kV), including a Fiber Optic Communication Line; (b) will expand the existing 1,150/500 kV substation at Ekibastuz by three bays and installing shunt reactors (3x60 MVAR) to accommodate the new 500 kV link with the Agadyr substation. The existing 1,150 kV switchgear is presently operated at 500 kV; (c) will expand the existing 500 kV substation at Agadyr by six bays to accommodate the new 500 kV link with the Ekibastuz and YuKGRES substations; and (d) includes consulting services for: (i) procurement and project management for the construction of the 500 kV OHL between Ekibastuz and Agadyr; and (ii) further reforms of the transmission sector, including transmission pricing (zonal tariffs) and establishment of a real time balancing market.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data