logo
ProjectClosed

North-South Electricity Transmission Project

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

The North-South Electricity Transmission Project for Kazakhstan will ensure that business enterprises and households in southern Kazakhstan have access to adequate, reliable and cost effective supply of electricity. The project consists of the following components: (a) involves construction of a new 475 km 500 kV single circuit overhead line (OHL) from the air-insulated substation Ekibastuz (1,150

Status
Closed
Sector
Power Generation (CCGT), Broadband, Telecommunications, Government
Location
Kazakhstan
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about North-South Electricity Transmission Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “North-South Electricity Transmission Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Kazakhstan. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The North-South Electricity Transmission Project for Kazakhstan will ensure that business enterprises and households in southern Kazakhstan have access to adequate, reliable and cost effective supply of electricity. The project consists of the following components: (a) involves construction of a new 475 km 500 kV single circuit overhead line (OHL) from the air-insulated substation Ekibastuz (1,150/500 kV) to the airinsulated substation Agadyr (500 kV), including a Fiber Optic Communication Line; (b) will expand the existing 1,150/500 kV substation at Ekibastuz by three bays and installing shunt reactors (3x60 MVAR) to accommodate the new 500 kV link with the Agadyr substation. The existing 1,150 kV switchgear is presently operated at 500 kV; (c) will expand the existing 500 kV substation at Agadyr by six bays to accommodate the new 500 kV link with the Ekibastuz and YuKGRES substations; and (d) includes consulting services for: (i) procurement and project management for the construction of the 500 kV OHL between Ekibastuz and Agadyr; and (ii) further reforms of the transmission sector, including transmission pricing (zonal tariffs) and establishment of a real time balancing market.

Original sector

FY17 - Energy and Extractives

Budget

Location

Country

Kazakhstan

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Broadband, Telecommunications, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project