North-South Expressway Central Link

Sector: Road • Location: Malaysia

Source: World Bank Group

Project
Cancelled

In April 1994, the Malaysian government awarded a BOT concession for a link road between the Klang Valley Expressway and a point on the North-South Expressway just north of KL International Airport. The concession went to United Engineers (Malaysia) Berhad, who turned it over to a wholly-owned subsidiary, Expressway Lingkaran Tengah Sdn Bhd (ELITE). Construction of the 48-km highway started in Nov

Status
Failure
Sector
Road, Airport, Commercial, Cable car, Bridge, Telecommunications, Government, Automotive
Location
Malaysia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about North-South Expressway Central Link

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “North-South Expressway Central Link” is an infrastructure initiative in the Road sector, located in Malaysia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Cancelled

Taiyo status

Failure

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In April 1994, the Malaysian government awarded a BOT concession for a link road between the Klang Valley Expressway and a point on the North-South Expressway just north of KL International Airport. The concession went to United Engineers (Malaysia) Berhad, who turned it over to a wholly-owned subsidiary, Expressway Lingkaran Tengah Sdn Bhd (ELITE). Construction of the 48-km highway started in November 1994 and was divided into 3 sections. The first 9.8km section was completed in December 1996, and opened to the public on 16 December. The second, 38km, section opened in October 1997 - seven months ahead of schedule. Construction cost RM1.1 billion (US$430 million). ELITE's performance was highly hindered by the Asian crisis in 1997/98. In July 1999, ELITE defaulted on M$440m floating rate notes, M$400m bonds, and a M$100m bridging loan from Bank Bumiputra. In December 2000, the government approved a soft loan of approximately M$100m to part finance the construction of the Putra Jaya Interchange. In March 2001, the company issued Islamic Bonds with a face of M$1.860bn, M$1.076bn of which was earmarked to repay its debt. The bond has been rated A2 by Rating Agency of Malaysia and is divided into nine tranches. In October 2002, the government extended the concession period by seven years from 2018 to 2025.

Original sector

Transport

Procurement method

Budget

Location

Country

Malaysia

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Road, Airport, Commercial, Cable car, Bridge, Telecommunications, Government, Automotive

Article published date

2024-09-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project