North-South Expressway Central Link
Sector: Airport • Location: Kuala Lumpur, Malaysia
Source: World Bank Group
In April 1994, the Malaysian government awarded a BOT concession for a link road between the Klang Valley Expressway and a point on the North-South Expressway just north of KL International Airport. The concession went to United Engineers (Malaysia) Berhad, who turned it over to a wholly-owned subsidiary, Expressway Lingkaran Tengah Sdn Bhd (ELITE). Construction of the 48-km highway started in Nov
- Status
- Failure
- Sector
- Airport, Cable car, Government, Road, Bridge, Automotive, Commercial, Telecommunications
- Location
- Kuala Lumpur, Malaysia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about North-South Expressway Central Link
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Cancelled |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In April 1994, the Malaysian government awarded a BOT concession for a link road between the Klang Valley Expressway and a point on the North-South Expressway just north of KL International Airport. The concession went to United Engineers (Malaysia) Berhad, who turned it over to a wholly-owned subsidiary, Expressway Lingkaran Tengah Sdn Bhd (ELITE). Construction of the 48-km highway started in November 1994 and was divided into 3 sections. The first 9.8km section was completed in December 1996, and opened to the public on 16 December. The second, 38km, section opened in October 1997 - seven months ahead of schedule. Construction cost RM1.1 billion (US$430 million). ELITE's performance was highly hindered by the Asian crisis in 1997/98. In July 1999, ELITE defaulted on M$440m floating rate notes, M$400m bonds, and a M$100m bridging loan from Bank Bumiputra. In December 2000, the government approved a soft loan of approximately M$100m to part finance the construction of the Putra Jaya Interchange. In March 2001, the company issued Islamic Bonds with a face of M$1.860bn, M$1.076bn of which was earmarked to repay its debt. The bond has been rated A2 by Rating Agency of Malaysia and is divided into nine tranches. In October 2002, the government extended the concession period by seven years from 2018 to 2025. |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | Malaysia |
State | Kuala Lumpur |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Airport, Cable car, Government, Road, Bridge, Automotive, Commercial, Telecommunications |
Article published date | 2024-05-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project