North-South Transmission Cable Tunnel Contract NS3

Sector: Power Generation (CCGT) • Location: Singapore

Source: Hyundai Engineering

Project
Closed

Using TBMs to realign power grid in SingaporeHyundai E&C received the NS3 section of the North-South transmission cable tunnel project in 2012 from the Singapore Power Asset(SPPA) in recognition of its extensive experience in MRT and other construction projects in Singapore. The builder kicked off the construction in October 2012. The project is to bore through a 40.2km transmission cable tunnel c

Project Information FAQ

Project Information

5 Q
The project “North-South Transmission Cable Tunnel Contract NS3” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Singapore. Taiyo aggregates data on it from Hyundai Engineering.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Using TBMs to realign power grid in SingaporeHyundai E&C received the NS3 section of the North-South transmission cable tunnel project in 2012 from the Singapore Power Asset(SPPA) in recognition of its extensive experience in MRT and other construction projects in Singapore. The builder kicked off the construction in October 2012. The project is to bore through a 40.2km transmission cable tunnel connecting the city state from east to west and from north to south. The 7.3km NS3 section extends from May Road, where the east-west section meets the north-south section, to Mary Mount and Ang Mo Kio in the northern part of the country. The large-scale project is valued at 238.9 million dollars, or approximately 260 billion won. The completion of the new cable tunnel is expected to guarantee a better power supply in Singapore by replacing old power lines with a 400 kV high voltage cable. There are two types of tunnel construction methods. One is drilling and blasting, and the other is using a huge excavation machine called tunnel boring machine(TBM). The TBM method employs a cylinder, called shield, seven meters in diameter so as to excavate a tunnel in a way that prevents the ground from collapsing and produces a smooth tunnel wall. TBMs have the advantages of enabling the stable construction of tunnels with weak ground conditions, reducing construction periods and decreasing risks of accidents.For this project, Hyundai E&C operated a total of three TBMs. In general, a TBM has a drilling capacity of three to four meters per day. However, the TBMs in the NS3 section moved at a daily average of 5.49 meters, about 149 percent higher than the excavation rate of those operated by other construction sections. This is attributable to Hyundai E&C’s efforts to directly manage the excavation work and the operation rate of the machines. The North-South transmission cable tunnel construction is distinguished from general tunnel projects as it is a specialized facility designed to transmit power. The construction section is about two times deeper than the 30-meter deep MRT tunnels. Moreover, the tunnel has a relatively long service life of about 100 years. Because of all this, the construction materials and facilities employed were totally different from those used for general tunnel construction since they should withstand both water and air pressure at a depth of 60 meters below ground surface. Hyundai E&C made all-out efforts to supply construction materials with longer endurance period and better specifications and conduct several quality-related tests. Despite the hectic schedule, the construction site did its best to ensure safety management.Even before the construction began, the construction site meticulously prepared for safety management plans. Throughout the construction period, it held weekly and monthly meetings and conducted frequent inspections to let safety management take root and discuss how to improve related issues at work. As a result, the NS3 section took first place at the SP Group POS Safety Award in 2015 and was ranked no. 1 in the safety inspection of overseas construction projects conducted by construction bodies of Hyundai Motor Group in 2017.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data