North Star Junction Solar and Battery System
Sector: Metal • Location: Port Hedland, Western Australia, Australia
Source: Discovery Alert
A 100 MW solar photovoltaic installation fully operational with an integrated 50 MW / 250 MWh battery energy storage system commissioned in December 2025. This site serves as an early proof point for Fortescue's broader renewable energy microgrid programme in the Pilbara.
- Status
- Under Construction
- Sector
- Metal, Energy Storage, Power Generation (CCGT), Solar
- Location
- Port Hedland, Western Australia, Australia
- Updated
- 22 Jul 2026
- Source
- Discovery Alert
ConstructChat
Ask ConstructChat about North Star Junction Solar and Battery System
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | operational |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A 100 MW solar photovoltaic installation fully operational with an integrated 50 MW / 250 MWh battery energy storage system commissioned in December 2025. This site serves as an early proof point for Fortescue's broader renewable energy microgrid programme in the Pilbara. |
Original sector | Energy |
Location
Country | Australia |
State | Western Australia |
City | Port Hedland |
Source
Source | Discovery Alert |
URL |
More Details
Record type | Project |
Sector | Metal, Energy Storage, Power Generation (CCGT), Solar |
Article published date | 2026-05-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
