logo

North Station Draw One Bridge Replacement and Associated Track and Signal Upgrades

Sector: Rail • Location: Cambridge, Boston, Somerville, Massachusetts, United States

Source: Construction Equipment Guide

Project
Planned

The project involves replacing the existing 1930s-era Draw One bascule bridges with new vertical lift spans, modernizing rail operations across the Charles River. It includes upgrades to approach trestles, construction of a new Tower A control facility, addition of a new Platform F at North Station, and comprehensive track, signal, and Positive Train Control upgrades to improve safety, resiliency,

Project Information FAQ

Project Information

4 Q
The project “North Station Draw One Bridge Replacement and Associated Track and Signal Upgrades” is an infrastructure initiative in the Rail sector, located in Cambridge, Boston, Somerville, Massachusetts, United States. Taiyo aggregates data on it from Construction Equipment Guide.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

planned

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project involves replacing the existing 1930s-era Draw One bascule bridges with new vertical lift spans, modernizing rail operations across the Charles River. It includes upgrades to approach trestles, construction of a new Tower A control facility, addition of a new Platform F at North Station, and comprehensive track, signal, and Positive Train Control upgrades to improve safety, resiliency, and operational efficiency. The corridor will expand from four to six tracks, reducing congestion and improving reliability while maintaining continuous commuter rail and Amtrak service during construction.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data