logo
ProjectPlanned

North Tarrant Express Highway Improvement Project

The owner, status and timeline of this project. A free account opens every field.

Source: Fort Worth Report

A three-year highway improvement project near downtown Fort Worth to replace the 63-year-old Sylvania Avenue bridge over Airport Freeway and reconstruct nearby frontage roads of Interstate 35 West. The project includes utility relocations, entrance and exit ramp reconfigurations along Airport Freeway (State Highway 121), and construction of a continuous eastbound frontage road with a new bridge ov

Status
Prospective
Sector
Bridge, Power Transmission, Airport, Road, Power Generation (CCGT)
Location
Fort Worth, Texas, United States of America
Updated
22 Jul 2026
Source
Fort Worth Report

ConstructChat

Ask ConstructChat about North Tarrant Express Highway Improvement Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “North Tarrant Express Highway Improvement Project” is an infrastructure initiative in the Bridge sector, located in Fort Worth, Texas, United States. Taiyo aggregates data on it from Fort Worth Report.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A three-year highway improvement project near downtown Fort Worth to replace the 63-year-old Sylvania Avenue bridge over Airport Freeway and reconstruct nearby frontage roads of Interstate 35 West. The project includes utility relocations, entrance and exit ramp reconfigurations along Airport Freeway (State Highway 121), and construction of a continuous eastbound frontage road with a new bridge over the Trinity River.

Original sector

Transportation

Budget

Location

Country

United States of America (USA)

State

Texas

City

Fort Worth

Source

Source

Fort Worth Report

URL

More Details

Record type

Project

Sector

Bridge, Power Transmission, Airport, Road, Power Generation (CCGT)

Article published date

2026-03-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project