North Vancouver - D - Public Electric Vehicle Charging Infrastructure
The status, timeline and source of this project. A free account opens every field.
Source: Infrastructure Canada
The proposed project will install a public network of approximately 10 Level-2 and two direct-current fast-charge electric vehicle charging ports on key transportation routes, in priority buildings, and near multi-family and social housing in the District of North Vancouver. The project will reduce greenhouse gas emissions by increasing public access to electric vehicle charging that utilizes BC’s
- Status
- Prospective
- Sector
- Seaport, Electric Vehicles (EVs), Automotive, Power Generation (CCGT), Government
- Location
- British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about North Vancouver - D - Public Electric Vehicle Charging Infrastructure
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | pre-construction |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project will install a public network of approximately 10 Level-2 and two direct-current fast-charge electric vehicle charging ports on key transportation routes, in priority buildings, and near multi-family and social housing in the District of North Vancouver. The project will reduce greenhouse gas emissions by increasing public access to electric vehicle charging that utilizes BC’s clean electricity supply. The project works will include: - approximately 10 Level-2 and 2 direct-current fast-charge (DCFC) electric vehicle charging ports; - electrical service upgrades; and - site work, mechanical, electrical, control/monitoring, signage, and other related works and appurtenances. |
Original sector | Green Energy |
Location
Country | Canada |
State | British Columbia |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Seaport, Electric Vehicles (EVs), Automotive, Power Generation (CCGT), Government |
Article published date | 2025-10-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Seaport projects in Canada
- Canada Post Pacific Processing Centre
- Maritime Helicopter Support Facilities - 12 Wing Shearwater
- Residue Storage Areas and Dams
- Long Harbour Processing Plant Site
- Winnipeg Art Galley
- Renforcement du réseau de transport à 315 kV de l’Abitibi‑Témiscamingue
- Modernisation du complexe de Beauharnois‑Les Cèdres
- Marine Use Strategy
